1. Sum of tread and rise must lie between

2 / 50

2. Couple close roof is suitable for maximum span of

3 / 50

3. In the construction of arches, sand box method is used for

4 / 50

4. The maximum total settlement for raft foundation on clayey soils should be limited to

5 / 50

5. The proportions of lime and sand in the mortar normally used in brick construction are

6 / 50

6. Expansion Joints in masonry walls are provided in wall lengths usater than

7 / 50

7. The vehicle used in case of enamel paints is usually

8 / 50

8. Which of the following stresses is used for identifying the quality of structural steel ?

9 / 50

9. Which of the following gradients exerts maximum influence on properties of steel?

10 / 50

10. Proper amount of entrained air in concrete results in { i) better workability, ii) better resistance to freezing and thawing, iii) lesser workability, iv) less resistance to freezing and thawing} The correct answer is

11 / 50

11. Addition of pozzolana to ordinary Portland cement increases

12 / 50

12. The main constituent of cement which is responsible for initial setting of cement is

13 / 50

13. Hydraulic lime is obtained by

14 / 50

14. First class timber has an average life of

15 / 50

15. Plywood is made by bonding together thin layers of wood in such a way that the angle between grains of any layer to grains of adjacent layers is

16 / 50

16. The preparation of surface of stone to obtain plain edges or to obtain stones of required size and shape is known as

17 / 50

17. Granite is not suitable for ordinary building purpose because

18 / 50

18. A good building stone should not absorb water more than

19 / 50

19. Jumper is a tool used for

20 / 50

20. Which of the following is a mineral?

21 / 50

21. Which of the following sedimentary rocks changes into quartzite by metamorphic action?

22 / 50

22. Pick up the commonly adopted geophysical method in civil engineering from the following:

23 / 50

23. In clay soil

24 / 50

24. A wall constructed to resist the pressure of an earth filling, is called

25 / 50

25. For the construction of flyovers in sandy soils, the type of foundation provided, is

26 / 50

26. The maximum bearing capacity of soil is that of

27 / 50

27. The members which support covering material of a sloping roof, are

28 / 50

28. The sill of a common wooden partition is

29 / 50

29. The width of the hollow space between two walls of a cavity wall should not exceed

30 / 50

30. The stone whose crushing strength is least, is

31 / 50

31. The process of working a flat for the finishing coat, is known

32 / 50

32. The arrangement of supporting an existing structure by providing supports underneath, is known as

33 / 50

33. If height of the first stored of a building is 2 m and riser is 13 cm, the number of treads required, is

34 / 50

34. The Auger boring method is not suitable for

35 / 50

35. The process of making the back ground rough, before plastering, is

36 / 50

36. The under surface of an arch, is called

37 / 50

37. The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as

38 / 50

38. The vertical members fixed between steps and hand rail, are known

39 / 50

39. Depth of lean concrete bed placed at the bottom of a wall footing, is kept

40 / 50

40. The concrete slump recommended for foundations, is

41 / 50

41. The type of stone masonry in which stones of same height are laid in layers, is called

42 / 50

42. The dimensions of a half queen closer, are

43 / 50

43. The concrete slump recommended for columns, is

44 / 50

44. Herringbone bond is used for

45 / 50

45. The type of pointing in which a V-shaped projection outside the wall surface, is provided, is called

46 / 50

46. Pile foundation is generally provided if soil is

47 / 50

47. The depth of excavation of foundations, is generally measured with a

48 / 50

48. The angle between skew back of a flat arch and the horizontal, is kept approximately equal to

49 / 50

49. The foundation in which a cantilever beam is provided to join two footings, is known as

50 / 50

50. In the method of tube boring of soil investigation, the following is essential: