FAQ’s for Project Management Jobs
1 / 50
1. What is the full form of PPP?
2 / 50
2. Which tax is imposed by the Central Government but the state government collects the tax. What is that tax called as?
3 / 50
3. If any product is imported by any company from abroad, then which tax is applicable on it?
4 / 50
4. Which one is an indirect tax?
5 / 50
5. Rectifications of identified correcttions in cash-book are done using which colur pen?
6 / 50
6. Public Works Department executes projects primarly of which department?
7 / 50
7. To the contractor we make the payment for work done but the quantity is not measured at the time of payment is called as?
8 / 50
8. All measurements of a work or project are entered in?
9 / 50
9. Which of these works are included in Public Works Department?
10 / 50
10. For allotment of work quotations are invited in which type of system?
11 / 50
11. The occurrence of accident in the construction will be effect?
12 / 50
12. What are the cause of the accidents in the project site?
13 / 50
13. The site engineer records the quantities of work done at the site and also uses it as a tool for payment to the contractor for his work done in a book. What is the book called as?
14 / 50
14. What is the process called in which the actual field or site progress is compared with the estimated progress?
15 / 50
15. By whome the Job layout is prepared?
16 / 50
16. Name the unit provided for fire hazards safety purposes?
17 / 50
17. What are the factors on which the job layout for any project will depend?
18 / 50
18. What is the first stage of a construction?
19 / 50
19. Who are involved in selection of a construction site?
20 / 50
20. What is or are the main disadvantage of the line organisation is?
21 / 50
21. From the below given options choose time estimates of activities and probability of their occurrence followed by PERT analysis is called as?
22 / 50
22. Which one of the following is used in PERT method ?
23 / 50
23. What is the main factor which affects the construction of project most?
24 / 50
24. A contractor in construction of a project is
25 / 50
25. As pet the below mentioned optioned each work should be planned with respect to?
26 / 50
26. At which stage the contract documents are prepared?
27 / 50
27. From the below mentioned optiones which of the following is not role of the contractor
28 / 50
28. Which of the following is not a characteristics of a Good organization ?
29 / 50
29. What arethe 4M of construction?
30 / 50
30. Pick up the correct statement regarding CPM from the below mentioned options?
31 / 50
31. Consider the following statements regarding slack, choose the correct option; a) The free slack never exceeds the total slack b) The jobs that have total slack need not necessarily have the free slack c) A job can have a free slack only if it has more total slack that the one of its immediate successors.
32 / 50
32. Consider the following definitions regarding slacks of project activities, from the below mentions options a) The difference between the early start and late start times of a job is called the total slack. b) The critical path is the one whose jobs have zero total slack c) The amount of time by which a job can be delayed without affecting the early start time of any job is called as the free slack d) The difference between the total slack of an activity and the minimum total slack of all its immediate successors is called as free slack.
33 / 50
33. Consider the following statements regarding the critical path of a project network. choose the correct option a) path is a set of nodes connected by arrows which begin at its initial node of the network and end at the terminal. b) The length of a path in a network is the total time it takes to travel the path. c) The shortest path in a project network is called critical path, d)Activities on the critical path are called critical activities.
34 / 50
34. If A is the optimistic time, B is the pessimistic time and M is most likely time of an activity, the expected time of the activity, is?
35 / 50
35. What is PERT?
36 / 50
36. What is CPM?
37 / 50
37. A CPM family includes which of the following?
38 / 50
38. What is a critical ratio scheduling?
39 / 50
39. The technique for establishing and maintaining priorities among the various jobs of a project, is known as?
40 / 50
40. Which one of the following represents an event?
41 / 50
41. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to?
42 / 50
42. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then which of the following relation holds good?
43 / 50
43. The difference between the time available to do a job and the time required to do the job, is known as?
44 / 50
44. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as?
45 / 50
45. An event is indicated on the network by a number enclosed in which symbol?
46 / 50
46. Critical path method is?
47 / 50
47. Bar charts are suitable for which types of works?
48 / 50
48. A construction schedule is prepared after collecting which of the following data?
49 / 50
49. Residential buildings are treated as which type of construtions?
50 / 50
50. What should be the minimum cost of a work to be called as project?