/50

FAQ’s for Project Management Jobs

1 / 50

1. Project Repot includes what from the below mentioned options?

2 / 50

2. What is the full form of PPP?

3 / 50

3. Rectifications of identified correcttions in cash-book are done using which colur pen?

4 / 50

4. In which form number the measurement Book is maintained?

5 / 50

5. Which one is these is an psychological cause of accident?

6 / 50

6. For the success of any construction project what characteristics is/are required?

7 / 50

7. to achieve good quality what do we require?

8 / 50

8. Brand value of any construction firm is created because of?

9 / 50

9. At which stage of construction, the inspection is required for error-free work to be executed?

10 / 50

10. What are the cause of the accidents in the project site?

11 / 50

11. The major danger in the constructions are due to?

12 / 50

12. To get a quality work output we need to proper select what?

13 / 50

13. What can we stop using Inspection for the site?

14 / 50

14. The data or the information obtained through the various methods of progress record such as measurement book, job diary, progress report etc, are quantified and analyzed. Name what do we call this process as?

15 / 50

15. According to minimum wages act normal working hours for adult workers is?

16 / 50

16. What is the aim of organising labour at the site?

17 / 50

17. Name the unit provided for fire hazards safety purposes?

18 / 50

18. What is or are the main principle of an organisation?

19 / 50

19. What are the elements of construction project planning?

20 / 50

20. From the below given options choose time estimates of activities and probability of their occurrence followed by PERT analysis is called as?

21 / 50

21. What is Slack time?

22 / 50

22. What is the oldest method of project planning is?

23 / 50

23. If any activity delayed to their succeeding activity due to some reason, that delay is known as?

24 / 50

24. The task performed in CPM is known as?

25 / 50

25. Which one of the following is not a resource of construction industry?

26 / 50

26. What does the Construction team means?

27 / 50

27. At which stage the tests for performance of construction is done

28 / 50

28. At which stage the specifications are prepared?

29 / 50

29. Road is included in which type of constructions mentioned below

30 / 50

30. What is an organization?

31 / 50

31. Pick up the correct statement regarding CPM from the below mentioned options?

32 / 50

32. Pick up the correct statement from the following with regards to P.M. network analysis of projects?

33 / 50

33. Consider the following statements regarding the critical path of a project network. choose the correct option a) path is a set of nodes connected by arrows which begin at its initial node of the network and end at the terminal. b) The length of a path in a network is the total time it takes to travel the path. c) The shortest path in a project network is called critical path, d)Activities on the critical path are called critical activities.

34 / 50

34. Pick up the incorrect statement from the below mentioned options?

35 / 50

35. What is a critical ratio scheduling?

36 / 50

36. The technique for establishing and maintaining priorities among the various jobs of a project, is known as?

37 / 50

37. Critical Path network helps an engineer to understand?

38 / 50

38. Pick up the correct statement from the following?

39 / 50

39. Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following?

40 / 50

40. Which one of the following represents an event?

41 / 50

41. Which one of the following represents an activity?

42 / 50

42. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to?

43 / 50

43. The performance of a specific task in CPM, is known as?

44 / 50

44. Various activities of a project, are shown on bar charts in which format?

45 / 50

45. An Executive Engineer may have powers to approve amount up to?

46 / 50

46. What is the main principle of an organization?

47 / 50

47. Frederick W. Taylor introduced a system of working which is known as?

48 / 50

48. The main disadvantage of line organization is?

49 / 50

49. Time and progress chart of a construction, is also known as?

50 / 50

50. Railway projects are treated as which type of construtions?

Your score is