FAQ’s for Project Management Jobs

1 / 50

1. In which Report do we get the specific activities, events and occurrences?

2 / 50

2. Which one describe the ability to work successfully for a project to meet the futuristic goals?

3 / 50

3. Project Repot includes what from the below mentioned options?

4 / 50

4. What is the full form of DPR?

5 / 50

5. Tools and plants purchased for general use of division shall be debited to Which Catogery?

6 / 50

6. What is the meaning of intermediate payment?

7 / 50

7. At which stage of construction, the inspection is required for error-free work to be executed?

8 / 50

8. What can we improve by the quality control method?

9 / 50

9. The Triangle of construction management completes with?

10 / 50

10. From the given below options choose the functions of the inspection department?

11 / 50

11. Select the type of measurement book used by the junior engineer from the given options?

12 / 50

12. A site engineer should ensure to have best output of the work given to the labour must be?

13 / 50

13. By whome the Job layout is prepared?

14 / 50

14. What is the aim of organising labour at the site?

15 / 50

15. Name the unit provided for fire hazards safety purposes?

16 / 50

16. Which type of organisational structure is mostly followed in civil construction?

17 / 50

17. What is or are the main principle of an organisation?

18 / 50

18. Which of the following does not represent an activity?

19 / 50

19. From the below given options choose time estimates of activities and probability of their occurrence followed by PERT analysis is called as?

20 / 50

20. What is Slack time?

21 / 50

21. Which one of the following is used in PERT method ?

22 / 50

22. What is the oldest method of project planning is?

23 / 50

23. Time and progress chart of a construction project is?

24 / 50

24. Which of these is the first largest industry in India in term of economic activity?

25 / 50

25. As pet the below mentioned optioned each work should be planned with respect to?

26 / 50

26. From the below mentioned optiones which of the following is not role of the contractor

27 / 50

27. Which of the following are the disadvantages of Line and Staff organization?

28 / 50

28. Road is included in which type of constructions mentioned below

29 / 50

29. Consider the following statements regarding slack, choose the correct option; a) The free slack never exceeds the total slack b) The jobs that have total slack need not necessarily have the free slack c) A job can have a free slack only if it has more total slack that the one of its immediate successors.

30 / 50

30. Pick up the correct statement regarding PERT from the below mwntioned options?

31 / 50

31. Consider the following definitions regarding slacks of project activities, from the below mentions options a) The difference between the early start and late start times of a job is called the total slack. b) The critical path is the one whose jobs have zero total slack c) The amount of time by which a job can be delayed without affecting the early start time of any job is called as the free slack d) The difference between the total slack of an activity and the minimum total slack of all its immediate successors is called as free slack.

32 / 50

32. In CPM analysis what do we choose?

33 / 50

33. What is a critical ratio scheduling?

34 / 50

34. In a certain project an activity C can only be started when activities A and B have been completed, which have no bearing on each other and can be started independently. The correct network for the activities, is?

35 / 50

35. The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as?

36 / 50

36. Which one of the following represents an activity?

37 / 50

37. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to?

38 / 50

38. The critical activity has?

39 / 50

39. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then which of the following relation holds good?

40 / 50

40. The difference between the time available to do a job and the time required to do the job, is known as?

41 / 50

41. An event is indicated on the network by a number enclosed in which symbol?

42 / 50

42. PERT analysis is based on?

43 / 50

43. Bar charts are suitable for which types of works?

44 / 50

44. The Overall in-charge of an organization at the site responsible for the execution of the works, is called as?

45 / 50

45. Henry Gantt developed Bar charts for planning and scheduling of projects in which year?

46 / 50

46. An Executive Engineer may have powers to approve amount up to?

47 / 50

47. What is the main principle of an organization?

48 / 50

48. Military organization is known as which type of organization?

49 / 50

49. While filling the tender for any work, the contractor considers which of the following?

50 / 50

50. Modular co-ordination of construction means proper?