FAQ’s for Quantity surveyor Jobs
1 / 50
1. The charges represented directly in the commodity produced are called as?
2 / 50
2. What is the meaning of Price?
3 / 50
3. What is the meaning of net income?
4 / 50
4. When we get total income from different sources what do we call it as?
5 / 50
5. The Owner who allows another person to enjoy rights over his property is called as?
6 / 50
6. The long term lease is granter for how many years?
7 / 50
7. What do we calll the owner who grants the lease of the property to the other person as?
8 / 50
8. what do we call when we try to recive annuity for an indefinite period?
9 / 50
9. When we try to make the payment of a debt in a series of equal periodic instalments, it is called as?
10 / 50
10. What do we call when the capital sum required to be invested in order to receive an annuity at certain rate of interest, is called as?
11 / 50
11. If a property is capable of fetching more return due to its alternative use or by providing some development works, such inherent value of a property is known as?
12 / 50
12. The value of a property at the end of its usefull life with out dismanteling it is called as?
13 / 50
13. When we dismantel the property when we can not use the property for usage we try to sell that waste materila, what do we call that value as?
14 / 50
14. As per the standards what is the length of a steel rod in meters?
15 / 50
15. Calculate the quantity of cement required for 10 m³ of 1: 2 : 4 cement concrete?
16 / 50
16. Calculate the quantity of cement required for 10 m³ of brick work in cement mortar 1: 3?
17 / 50
17. How many bricks are required for 15 Cu.m of brick masonry work?
18 / 50
18. Which IS Code do we use for mode of measurment?
19 / 50
19. What is the cost of a building which consist of 400 cubic meters. The rate per cubic meter is Rs. 180/- ?
20 / 50
20. What is the process of calculating the quantities and costs of the various items required to complete the work is called as?
21 / 50
21. What is the name given to the rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labors, the cost of equipments and other miscellaneous petty expenses require for the completion of the project?
22 / 50
22. What is the unit of measurment of excavation?
23 / 50
23. When ever we write the specifications it is written in a language so that they indicate what the work should be and words like “shall be” or “should be” are used. Is it Ture or False?
24 / 50
24. In the contract document which type of specificaitons is a part of it?
25 / 50
25. Choose form the below mentioned options what is or are the Important contract documents?
26 / 50
26. What is the term given for the detailed description of the quality of materials and workmanship required to complete an engineering project in accordance with its drawings and details?
27 / 50
27. The brick massonary for honey comb massonary is measured in?
28 / 50
28. what is the unit of measurment of Surface dressing?
29 / 50
29. For hard soil the earthwork excavation is measured in?
30 / 50
30. When we measure the wood, what units do use to measure them?
31 / 50
31. When we are measuring the weight of an item we corrrectly measure nearest to how much Kgs?
32 / 50
32. What do we call the cost for the items mentioned in the question: – general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job?
33 / 50
33. From the below mentioned options select which one is not a spot item?
34 / 50
34. When we are measuring an area we measure it correctly and nearest to?
35 / 50
35. Which IS Code do we use for mode of measurment?
36 / 50
36. The Electrification cost of a building is how much % of total estimate?
37 / 50
37. The area of our house in which we can live is called as?
38 / 50
38. Based on the plinth area of the building which estimate is prepared?
39 / 50
39. What is the unit of road used for the measurment for usage?
40 / 50
40. When we modifying the original detailed estimate and prepare a new estimate what is it called as?
41 / 50
41. We use appoximate estimate to prepare an estimate for an work what is also known as?
42 / 50
42. What is the process of calculating the quantities of various items for any construction work is is called as?
43 / 50
43. From the below mentioned options choose which is not included in the carpet area?
44 / 50
44. Which one of the following is the most reliable estimate?
45 / 50
45. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?
46 / 50
46. For the construction of buildings, What are the subheads of the estimate for construction of building?
47 / 50
47. The omitted cover of concrete is assumed to be for estimating a reinforced cement structure?
48 / 50
48. Which of these does not include the plinth area of a building?
49 / 50
49. To do a work the rate of an item depends on?
50 / 50
50. How much water is required for one kg distemper?
Your score is
Restart quiz