1. The charges represented directly in the commodity produced are called as?
2 / 50
2. What is the meaning of net income?
3 / 50
3. When we deduct outging amount from the gross income what do we call it as?
4 / 50
4. When we get total income from different sources what do we call it as?
5 / 50
5. The Owner who allows another person to enjoy rights over his property is called as?
6 / 50
6. What do we calll the owner who grants the lease of the property to the other person as?
7 / 50
7. When we pay annuity at the end of each period for a certain number of years, what is it called as?
8 / 50
8. what do we call when we try to recive annuity for an indefinite period?
9 / 50
9. When we try to make the payment of a debt in a series of equal periodic instalments, it is called as?
10 / 50
10. What do we call when the capital sum required to be invested in order to receive an annuity at certain rate of interest, is called as?
11 / 50
11. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?
12 / 50
12. If we sell a property lower than the market value of that time is said to have what value?
13 / 50
13. When we put the property for sale in open market at any particuar time the price what we obtain is called as?
14 / 50
14. Calculate the quantity of sand required for 5 m³ of brick work in cement mortar 1: 6?
15 / 50
15. Calculate the quantity of cement required for 10 m³ of brick work in cement mortar 1: 3?
16 / 50
16. How many bricks are required for 15 Cu.m of brick masonry work?
17 / 50
17. Which IS Code do we use for mode of measurment?
18 / 50
18. What do we call the process of determining the probable cost of the project after knowing the quantities of various items and their unit rate is called as?
19 / 50
19. Is the below statement True of False, Bricks shall be laid in English bond unless otherwise specified?
20 / 50
20. If a 1st class dry brick is immersed in water for 24 hours how % of water should it absorb by its weight?
21 / 50
21. As per which IS Code the cement should be used in the specifications?
22 / 50
22. When ever we write the specifications it is written in a language so that they indicate what the work should be and words like “shall be” or “should be” are used. Is it Ture or False?
23 / 50
23. In all engineering departments they prepare detailed specifications of certain common items of construction and publish them in book form. What are such types of specifications called as?
24 / 50
24. In the contract document which type of specificaitons is a part of it?
25 / 50
25. In the contract document which type of specificaitons is not a part of it?
26 / 50
26. What is the term given for the detailed description of the quality of materials and workmanship required to complete an engineering project in accordance with its drawings and details?
27 / 50
27. The brick massonary for honey comb massonary is measured in?
28 / 50
28. What is the unit of measurment of damp proof course (D.P.C.)?
29 / 50
29. The birck work done in Foundation, Plinth level, Supestructure are measured in?
30 / 50
30. What is the Unit of measurment of Cement?
31 / 50
31. While doing backfilling or refilling earthwork in foundation pit the thickness should not exceed for each layer?
32 / 50
32. The bricks for masonry structure are measured in cubic meters except in the case of?
33 / 50
33. Choose from the below given options what do we consider while preparing a detailed estimate?
34 / 50
34. When we are measuring an area we measure it correctly and nearest to?
35 / 50
35. Which IS Code do we use for mode of measurment?
36 / 50
36. How much % of amount from detail estimate is their for work charged establishment?
37 / 50
37. For some items it is hard for the for the estimator to fix an amount without seeing and studying them in detail. Such items are known as?
38 / 50
38. What is the term give to the procedure of costing or valuing an item of work on the basis of actual laborers and materials required?
39 / 50
39. Based on the plinth area of the building which estimate is prepared?
40 / 50
40. When we modifying the original detailed estimate and prepare a new estimate what is it called as?
41 / 50
41. From the below mentioned options choose which estimate is least accurate to work?
42 / 50
42. To prepare an proper estimate of a work we requier Drawing, Specifications and what?
43 / 50
43. What is the process of calculating the quantities of various items for any construction work is is called as?
44 / 50
44. The calculation of the quantities and costs of the various items required for work is called as?
45 / 50
45. How much % of balcony area is included in the floor area?
46 / 50
46. From the below mentioned options choose which is not included in the carpet area?
47 / 50
47. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?
48 / 50
48. What is the actual size of a modular brick according to Indian Standard institute?
49 / 50
49. The correct metric unit is what is the corrcet metric units used for estimating th eqantities for construction of a building?
50 / 50
50. The omitted cover of concrete is assumed to be for estimating a reinforced cement structure?
Your score is
Restart quiz