1. What is the meaning of Cost?
2 / 50
2. What do we call a person who takes the lease of any thing?
3 / 50
3. The Owner who allows another person to enjoy rights over his property is called as?
4 / 50
4. The perpetuity lease(Endless Duration) is granted for how many years?
5 / 50
5. What do we calll the owner who grants the lease of the property to the other person as?
6 / 50
6. what do we call when we try to recive annuity for an indefinite period?
7 / 50
7. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?
8 / 50
8. If a property is capable of fetching more return due to its alternative use or by providing some development works, such inherent value of a property is known as?
9 / 50
9. From the total cost of the construction how much % is the scrap value of the building?
10 / 50
10. If we sell a property lower than the market value of that time is said to have what value?
11 / 50
11. When we remove the original value from the depeciation value what do we get?
12 / 50
12. Calculate the quantity of sand required for 5 m³ of brick work in cement mortar 1: 6?
13 / 50
13. How many bricks are required for 15 Cu.m of brick masonry work?
14 / 50
14. What is the cost of a building which consist of 400 cubic meters. The rate per cubic meter is Rs. 180/- ?
15 / 50
15. What do we call the process of calculating the quantities of various items required for complete the project?
16 / 50
16. What si the standard size of a normal brick?
17 / 50
17. What do we call the work done per day by a skilled labour to complete the quantity of work?
18 / 50
18. What is the abrivation of S.O.R as per Quantity Surveying?
19 / 50
19. For any work the rate of an item depends on which one of the following mentioned below?
20 / 50
20. Different weather conditions like extreme cold, heat or rain how will they effect the project?
21 / 50
21. What is the name given to the rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labors, the cost of equipments and other miscellaneous petty expenses require for the completion of the project?
22 / 50
22. As per which IS Code the sand should be used in the specifications?
23 / 50
23. When ever we write the specifications it is written in a language so that they indicate what the work should be and words like “shall be” or “should be” are used. Is it Ture or False?
24 / 50
24. While we make specifications the sentence shall be in which format?
25 / 50
25. The Public Works department publishes the standard specifications in a book. What is the name given to that book?
26 / 50
26. In all engineering departments they prepare detailed specifications of certain common items of construction and publish them in book form. What are such types of specifications called as?
27 / 50
27. What is the term given for the detailed description of the quality of materials and workmanship required to complete an engineering project in accordance with its drawings and details?
28 / 50
28. What is the unit of measurment of Centering and shuttering?
29 / 50
29. The brick massonary for honey comb massonary is measured in?
30 / 50
30. What is the unit of measurment of Reinforced Cement Concrete(R.C.C)?
31 / 50
31. The steel used in the reinforcments is mearuded in?
32 / 50
32. What is the Unit of measurment of Cement?
33 / 50
33. While doing backfilling or refilling earthwork in foundation pit the thickness should not exceed for each layer?
34 / 50
34. Choose from the below given options what do we consider while preparing a detailed estimate?
35 / 50
35. What do we call the cost for the items mentioned in the question: – general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job?
36 / 50
36. The amount which is provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing estimate is called as?
37 / 50
37. From the below mentioned options choose what is required while preparing a detailed estimate?
38 / 50
38. For some items it is hard for the for the estimator to fix an amount without seeing and studying them in detail. Such items are known as?
39 / 50
39. The Electrification cost of a building is how much % of total estimate?
40 / 50
40. What is the unit of stadium used for the usage?
41 / 50
41. To prepare an proper estimate of a work we requier Drawing, Specifications and what?
42 / 50
42. What is the process of calculating the quantities of various items for any construction work is is called as?
43 / 50
43. The calculation of the quantities and costs of the various items required for work is called as?
44 / 50
44. How much % of balcony area is included in the floor area?
45 / 50
45. From the below mentioned options choose which is not included in the carpet area?
46 / 50
46. Pick up the correct statement from the below mentioned options?
47 / 50
47. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?
48 / 50
48. To prepare a detailed estimate, what is the main factor to be considered?
49 / 50
49. To do a work the rate of an item depends on?
50 / 50
50. How much water is required for one kg distemper?