FAQ’s for Quantity surveyor Jobs
1 / 50
1. What is the meaning of Cost?
2 / 50
2. What is the meaning of Price?
3 / 50
3. What is the meaning of net income?
4 / 50
4. When we get total income from different sources what do we call it as?
5 / 50
5. The perpetuity lease(Endless Duration) is granted for how many years?
6 / 50
6. The long term lease is granter for how many years?
7 / 50
7. What do we calll the owner who grants the lease of the property to the other person as?
8 / 50
8. what do we call when we try to recive annuity for an indefinite period?
9 / 50
9. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?
10 / 50
10. If a property is capable of fetching more return due to its alternative use or by providing some development works, such inherent value of a property is known as?
11 / 50
11. If we sell a property lower than the market value of that time is said to have what value?
12 / 50
12. The value of a property at the end of its usefull life with out dismanteling it is called as?
13 / 50
13. When we remove the original value from the depeciation value what do we get?
14 / 50
14. When we dismantel the property when we can not use the property for usage we try to sell that waste materila, what do we call that value as?
15 / 50
15. When we put the property for sale in open market at any particuar time the price what we obtain is called as?
16 / 50
16. How many bricks are required for 15 Cu.m of brick masonry work?
17 / 50
17. What do we call the process of calculating the quantities of various items required for complete the project?
18 / 50
18. What is the process of calculating the quantities and costs of the various items required to complete the work is called as?
19 / 50
19. What is the abrivation of S.O.R as per Quantity Surveying?
20 / 50
20. Different weather conditions like extreme cold, heat or rain how will they effect the project?
21 / 50
21. What is the name given to the rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labors, the cost of equipments and other miscellaneous petty expenses require for the completion of the project?
22 / 50
22. As per IS: 269, what should be the minimum compressive strength of Ordinary Portland Cement?
23 / 50
23. As per which IS Code the cement should be used in the specifications?
24 / 50
24. The Public Works department publishes the standard specifications in a book. What is the name given to that book?
25 / 50
25. In all engineering departments they prepare detailed specifications of certain common items of construction and publish them in book form. What are such types of specifications called as?
26 / 50
26. In the contract document which type of specificaitons is a part of it?
27 / 50
27. In the contract document which type of specificaitons is not a part of it?
28 / 50
28. Specifications are divided in to two catogories the first one is general specifications or brief specificatons and what is the second one called as?
29 / 50
29. What is the unit of measurment of Centering and shuttering?
30 / 50
30. Generally the Skirting is measured in?
31 / 50
31. The birck work done in Foundation, Plinth level, Supestructure are measured in?
32 / 50
32. For hard soil the earthwork excavation is measured in?
33 / 50
33. The steel used in the reinforcments is mearuded in?
34 / 50
34. The amount which is provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing estimate is called as?
35 / 50
35. When we are measuring an area we measure it correctly and nearest to?
36 / 50
36. What is the abbreviation of CBRI?
37 / 50
37. The Electrification cost of a building is how much % of total estimate?
38 / 50
38. What is the meaning of Floor area?
39 / 50
39. Based on the plinth area of the building which estimate is prepared?
40 / 50
40. What is the unit of stadium used for the usage?
41 / 50
41. What is the unit of hospitals used for repesenting the usage of hospital?
42 / 50
42. To prepare an proper estimate of a work we requier Drawing, Specifications and what?
43 / 50
43. After knowing the quantittes of various items and their unit rate we calculate the Propable cost of the project what is it called as?
44 / 50
44. How much % of balcony area is included in the floor area?
45 / 50
45. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?
46 / 50
46. For the construction of buildings, What are the subheads of the estimate for construction of building?
47 / 50
47. What is the actual size of a modular brick according to Indian Standard institute?
48 / 50
48. To prepare a detailed estimate, what is the main factor to be considered?
49 / 50
49. To do a work the rate of an item depends on?
50 / 50
50. How much water is required for one kg distemper?
Your score is
Restart quiz