FAQ’s for Quantity surveyor Jobs
1 / 50
1. What is the meaning of Cost?
2 / 50
2. When we get total income from different sources what do we call it as?
3 / 50
3. The perpetuity lease(Endless Duration) is granted for how many years?
4 / 50
4. what do we call when we try to recive annuity for an indefinite period?
5 / 50
5. What do we call when the capital sum required to be invested in order to receive an annuity at certain rate of interest, is called as?
6 / 50
6. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?
7 / 50
7. If a property is capable of fetching more return due to its alternative use or by providing some development works, such inherent value of a property is known as?
8 / 50
8. From the total cost of the construction how much % is the scrap value of the building?
9 / 50
9. If we sell a property lower than the market value of that time is said to have what value?
10 / 50
10. The value of a property at the end of its usefull life with out dismanteling it is called as?
11 / 50
11. When we remove the original value from the depeciation value what do we get?
12 / 50
12. When we dismantel the property when we can not use the property for usage we try to sell that waste materila, what do we call that value as?
13 / 50
13. When we put the property for sale in open market at any particuar time the price what we obtain is called as?
14 / 50
14. 1 bag of cement of 50 kgs covers how much volume?
15 / 50
15. What is the cost of a building which consist of 400 cubic meters. The rate per cubic meter is Rs. 180/- ?
16 / 50
16. What do we call the work done per day by a skilled labour to complete the quantity of work?
17 / 50
17. What is the abrivation of S.O.R as per Quantity Surveying?
18 / 50
18. Different weather conditions like extreme cold, heat or rain how will they effect the project?
19 / 50
19. What is the name given to the rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labors, the cost of equipments and other miscellaneous petty expenses require for the completion of the project?
20 / 50
20. Is the below statement True of False, Bricks shall be laid in English bond unless otherwise specified?
21 / 50
21. Is the following statement True of False The steel used in the reinforcment shall be of mild steel or deformed steel?
22 / 50
22. As per which IS Code the cement should be used in the specifications?
23 / 50
23. The Public Works department publishes the standard specifications in a book. What is the name given to that book?
24 / 50
24. In the contract document which type of specificaitons is a part of it?
25 / 50
25. What is the term given for the detailed description of the quality of materials and workmanship required to complete an engineering project in accordance with its drawings and details?
26 / 50
26. The unit of measurement of steel railing is?
27 / 50
27. Generally the Skirting is measured in?
28 / 50
28. The birck work done in Foundation, Plinth level, Supestructure are measured in?
29 / 50
29. what is the unit of measurment of Surface dressing?
30 / 50
30. When we measure the wood, what units do use to measure them?
31 / 50
31. What is the Unit of measurment of Cement?
32 / 50
32. The bricks for masonry structure are measured in cubic meters except in the case of?
33 / 50
33. When we are measuring the weight of an item we corrrectly measure nearest to how much Kgs?
34 / 50
34. The amount which is provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing estimate is called as?
35 / 50
35. When we are measuring an area we measure it correctly and nearest to?
36 / 50
36. What is the order or sequence of measurment as per ISI method which is to be used?
37 / 50
37. From the below mentioned options choose what is required while preparing a detailed estimate?
38 / 50
38. What is the term give to the procedure of costing or valuing an item of work on the basis of actual laborers and materials required?
39 / 50
39. The Electrification cost of a building is how much % of total estimate?
40 / 50
40. The area of our house in which we can live is called as?
41 / 50
41. What is the meaning of Floor area?
42 / 50
42. We use appoximate estimate to prepare an estimate for an work what is also known as?
43 / 50
43. From the below mentioned options choose which estimate is least accurate to work?
44 / 50
44. What is the process of calculating the quantities of various items for any construction work is is called as?
45 / 50
45. From the below mentioned options choose which is not included in the carpet area?
46 / 50
46. For which item the measurement is not made in square meters?
47 / 50
47. For the construction of buildings, What are the subheads of the estimate for construction of building?
48 / 50
48. What is the actual size of a modular brick according to Indian Standard institute?
49 / 50
49. The omitted cover of concrete is assumed to be for estimating a reinforced cement structure?
50 / 50
50. To prepare a detailed estimate, what is the main factor to be considered?