FAQ’s for Quantity surveyor Jobs

1 / 50

1. What is the meaning of Price?

2 / 50

2. When we deduct outging amount from the gross income what do we call it as?

3 / 50

3. When we get total income from different sources what do we call it as?

4 / 50

4. The long term lease is granter for how many years?

5 / 50

5. When we pay annuity at the end of each period for a certain number of years, what is it called as?

6 / 50

6. What do we call when the capital sum required to be invested in order to receive an annuity at certain rate of interest, is called as?

7 / 50

7. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?

8 / 50

8. If a property is capable of fetching more return due to its alternative use or by providing some development works, such inherent value of a property is known as?

9 / 50

9. From the total cost of the construction how much % is the scrap value of the building?

10 / 50

10. The value of a property at the end of its usefull life with out dismanteling it is called as?

11 / 50

11. When we remove the original value from the depeciation value what do we get?

12 / 50

12. When we dismantel the property when we can not use the property for usage we try to sell that waste materila, what do we call that value as?

13 / 50

13. When we put the property for sale in open market at any particuar time the price what we obtain is called as?

14 / 50

14. 1 bag of cement of 50 kgs covers how much volume?

15 / 50

15. Calculate the quantity of sand required for 5 m³ of brick work in cement mortar 1: 6?

16 / 50

16. Calculate the quantity of cement required for 10 m³ of brick work in cement mortar 1: 3?

17 / 50

17. What is the cost of a building which consist of 400 cubic meters. The rate per cubic meter is Rs. 180/- ?

18 / 50

18. What do we call the process of determining the probable cost of the project after knowing the quantities of various items and their unit rate is called as?

19 / 50

19. What si the standard size of a normal brick?

20 / 50

20. For the list of rates of various items is prepared after the analysis of rates and document is prepared. What is that document called as?

21 / 50

21. What is the abrivation of S.O.R as per Quantity Surveying?

22 / 50

22. Different weather conditions like extreme cold, heat or rain how will they effect the project?

23 / 50

23. Is the following statement True of False The steel used in the reinforcment shall be of mild steel or deformed steel?

24 / 50

24. As per which IS Code the sand should be used in the specifications?

25 / 50

25. As per which IS Code the cement should be used in the specifications?

26 / 50

26. While we make specifications the sentence shall be in which format?

27 / 50

27. Specifications are divided in to two catogories the first one is general specifications or brief specificatons and what is the second one called as?

28 / 50

28. The brick massonary for honey comb massonary is measured in?

29 / 50

29. Generally the Skirting is measured in?

30 / 50

30. The birck work done in Foundation, Plinth level, Supestructure are measured in?

31 / 50

31. The bricks for masonry structure are measured in cubic meters except in the case of?

32 / 50

32. When we are measuring the weight of an item we corrrectly measure nearest to how much Kgs?

33 / 50

33. What do we call the cost for the items mentioned in the question: – general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job?

34 / 50

34. From the below mentioned options select which one is not a spot item?

35 / 50

35. The amount which is provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing estimate is called as?

36 / 50

36. What is the order or sequence of measurment as per ISI method which is to be used?

37 / 50

37. From the below mentioned options choose what is required while preparing a detailed estimate?

38 / 50

38. For some items it is hard for the for the estimator to fix an amount without seeing and studying them in detail. Such items are known as?

39 / 50

39. What is the term give to the procedure of costing or valuing an item of work on the basis of actual laborers and materials required?

40 / 50

40. What is the abbreviation of CBRI?

41 / 50

41. The area of our house in which we can live is called as?

42 / 50

42. What is the meaning of Floor area?

43 / 50

43. What is the unit of road used for the measurment for usage?

44 / 50

44. From the below mentioned options choose which estimate is least accurate to work?

45 / 50

45. What is the process of calculating the quantities of various items for any construction work is is called as?

46 / 50

46. The calculation of the quantities and costs of the various items required for work is called as?

47 / 50

47. Pick up the correct statement from the below mentioned options?

48 / 50

48. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?

49 / 50

49. For the construction of buildings, What are the subheads of the estimate for construction of building?

50 / 50

50. Which of these does not include the plinth area of a building?