FAQ’s for Quantity surveyor Jobs
1 / 50
1. What is the meaning of Price?
2 / 50
2. When we deduct outging amount from the gross income what do we call it as?
3 / 50
3. When we get total income from different sources what do we call it as?
4 / 50
4. The long term lease is granter for how many years?
5 / 50
5. When we pay annuity at the end of each period for a certain number of years, what is it called as?
6 / 50
6. What do we call when the capital sum required to be invested in order to receive an annuity at certain rate of interest, is called as?
7 / 50
7. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?
8 / 50
8. If a property is capable of fetching more return due to its alternative use or by providing some development works, such inherent value of a property is known as?
9 / 50
9. From the total cost of the construction how much % is the scrap value of the building?
10 / 50
10. The value of a property at the end of its usefull life with out dismanteling it is called as?
11 / 50
11. When we remove the original value from the depeciation value what do we get?
12 / 50
12. When we dismantel the property when we can not use the property for usage we try to sell that waste materila, what do we call that value as?
13 / 50
13. When we put the property for sale in open market at any particuar time the price what we obtain is called as?
14 / 50
14. 1 bag of cement of 50 kgs covers how much volume?
15 / 50
15. Calculate the quantity of sand required for 5 m³ of brick work in cement mortar 1: 6?
16 / 50
16. Calculate the quantity of cement required for 10 m³ of brick work in cement mortar 1: 3?
17 / 50
17. What is the cost of a building which consist of 400 cubic meters. The rate per cubic meter is Rs. 180/- ?
18 / 50
18. What do we call the process of determining the probable cost of the project after knowing the quantities of various items and their unit rate is called as?
19 / 50
19. What si the standard size of a normal brick?
20 / 50
20. For the list of rates of various items is prepared after the analysis of rates and document is prepared. What is that document called as?
21 / 50
21. What is the abrivation of S.O.R as per Quantity Surveying?
22 / 50
22. Different weather conditions like extreme cold, heat or rain how will they effect the project?
23 / 50
23. Is the following statement True of False The steel used in the reinforcment shall be of mild steel or deformed steel?
24 / 50
24. As per which IS Code the sand should be used in the specifications?
25 / 50
25. As per which IS Code the cement should be used in the specifications?
26 / 50
26. While we make specifications the sentence shall be in which format?
27 / 50
27. Specifications are divided in to two catogories the first one is general specifications or brief specificatons and what is the second one called as?
28 / 50
28. The brick massonary for honey comb massonary is measured in?
29 / 50
29. Generally the Skirting is measured in?
30 / 50
30. The birck work done in Foundation, Plinth level, Supestructure are measured in?
31 / 50
31. The bricks for masonry structure are measured in cubic meters except in the case of?
32 / 50
32. When we are measuring the weight of an item we corrrectly measure nearest to how much Kgs?
33 / 50
33. What do we call the cost for the items mentioned in the question: – general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job?
34 / 50
34. From the below mentioned options select which one is not a spot item?
35 / 50
35. The amount which is provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing estimate is called as?
36 / 50
36. What is the order or sequence of measurment as per ISI method which is to be used?
37 / 50
37. From the below mentioned options choose what is required while preparing a detailed estimate?
38 / 50
38. For some items it is hard for the for the estimator to fix an amount without seeing and studying them in detail. Such items are known as?
39 / 50
39. What is the term give to the procedure of costing or valuing an item of work on the basis of actual laborers and materials required?
40 / 50
40. What is the abbreviation of CBRI?
41 / 50
41. The area of our house in which we can live is called as?
42 / 50
42. What is the meaning of Floor area?
43 / 50
43. What is the unit of road used for the measurment for usage?
44 / 50
44. From the below mentioned options choose which estimate is least accurate to work?
45 / 50
45. What is the process of calculating the quantities of various items for any construction work is is called as?
46 / 50
46. The calculation of the quantities and costs of the various items required for work is called as?
47 / 50
47. Pick up the correct statement from the below mentioned options?
48 / 50
48. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?
49 / 50
49. For the construction of buildings, What are the subheads of the estimate for construction of building?
50 / 50
50. Which of these does not include the plinth area of a building?
Your score is