FAQ’s for Project Management Jobs

1 / 50

1. Which one of the below mentioned options is an example of intellectual property?

2 / 50

2. Which one describe the ability to work successfully for a project to meet the futuristic goals?

3 / 50

3. Rectifications of identified correcttions in cash-book are done using which colur pen?

4 / 50

4. Public Works Department executes projects primarly of which department?

5 / 50

5. In which form no the hand receipt are maintained?

6 / 50

6. All measurements of a work or project are entered in?

7 / 50

7. The muster roll is maintained in which form no ?

8 / 50

8. To obtain work which sanction is not required?

9 / 50

9. For allotment of work quotations are invited in which type of system?

10 / 50

10. The occurrence of accident in the construction will be effect?

11 / 50

11. The Triangle of construction management completes with?

12 / 50

12. From the given below options choose in which work, inspection plays a significant role ?

13 / 50

13. What do we call the charts used for the graphical representation of the operation analysis?

14 / 50

14. What is the process called in which the actual field or site progress is compared with the estimated progress?

15 / 50

15. The data or the information obtained through the various methods of progress record such as measurement book, job diary, progress report etc, are quantified and analyzed. Name what do we call this process as?

16 / 50

16. Why do we use Job layout facilitate in construction work to proceed?

17 / 50

17. Name the unit provided for fire hazards safety purposes?

18 / 50

18. Which type of organisational structure is mostly followed in civil construction?

19 / 50

19. The plan which shows the exact location for placing the resources for construction is known as?

20 / 50

20. What is or are the main disadvantage of the line organisation is?

21 / 50

21. Line organisation is other wise known as?

22 / 50

22. Which of the following does not represent an activity?

23 / 50

23. What is the oldest method of project planning is?

24 / 50

24. What is the main factor which affects the construction of project most?

25 / 50

25. Construction of the power station comes in which type of construction as per the options mentioned below

26 / 50

26. What does the Construction team means?

27 / 50

27. What are the qualities of good construction manager?

28 / 50

28. Supervision for quality control is the part of which stage

29 / 50

29. In PWD which type of organization is is widely used

30 / 50

30. Which of the following are the disadvantages of Line and Staff organization?

31 / 50

31. Consider the following statements regarding Early start and early finish times, Choose the corrcet option. a) The earliest possible that the job can begin, is called the early start of the job b) The early finish of a job is early start time plus the job’s completion time c) For jobs with no predecessors, the early start is equal to start time of the project d) The early start of a job is the largest of the early finish times of all of the immediately predecessors.

32 / 50

32. In CPM analysis what do we choose?

33 / 50

33. Consider the following statements regarding the critical path of a project network. choose the correct option a) path is a set of nodes connected by arrows which begin at its initial node of the network and end at the terminal. b) The length of a path in a network is the total time it takes to travel the path. c) The shortest path in a project network is called critical path, d)Activities on the critical path are called critical activities.

34 / 50

34. The time which results in the least possible construction cost of an activity, is known as?

35 / 50

35. What is a critical ratio scheduling?

36 / 50

36. The technique for establishing and maintaining priorities among the various jobs of a project, is known as?

37 / 50

37. Critical path lies along the activities having total float?

38 / 50

38. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be?

39 / 50

39. The estimated time required to perform an activity, is known as?

40 / 50

40. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then which of the following relation holds good?

41 / 50

41. The difference between the time available to do a job and the time required to do the job, is known as?

42 / 50

42. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as?

43 / 50

43. Choose from the following what does a milestone chart represent as?

44 / 50

44. Various activities of a project, are shown on bar charts in which format?

45 / 50

45. What is the main principle of an organization?

46 / 50

46. A construction schedule is prepared after collecting which of the following data?

47 / 50

47. The main disadvantage of line organization is?

48 / 50

48. Time and progress chart of a construction, is also known as?

49 / 50

49. For the execution of a project, the role of a contractor is?

50 / 50

50. Power stations are generally treated as which type of construtions?