FAQ’s for Project Management Jobs

1 / 50

1. What is the full form of PPP?

2 / 50

2. Which one is an indirect tax?

3 / 50

3. What are the duties of a junior engineer?

4 / 50

4. Tools and plants purchased for general use of division shall be debited to Which Catogery?

5 / 50

5. In which form number the measurement Book is maintained?

6 / 50

6. In which form number the first and final bill are maintained?

7 / 50

7. What is the meaning of intermediate payment?

8 / 50

8. To obtain work which sanction is not required?

9 / 50

9. Which instrument is commonly used for sending an alerts message before starting of danger work?

10 / 50

10. What can we improve by the quality control method?

11 / 50

11. The site engineer records the quantities of work done at the site and also uses it as a tool for payment to the contractor for his work done in a book. What is the book called as?

12 / 50

12. The data or the information obtained through the various methods of progress record such as measurement book, job diary, progress report etc, are quantified and analyzed. Name what do we call this process as?

13 / 50

13. A site engineer should ensure to have best output of the work given to the labour must be?

14 / 50

14. Why do we use Job layout facilitate in construction work to proceed?

15 / 50

15. What is the aim of organising labour at the site?

16 / 50

16. The major principle of storing and stacking of any materials is to achieve with?

17 / 50

17. Which type of organisational structure is mostly followed in civil construction?

18 / 50

18. The plan which shows the exact location for placing the resources for construction is known as?

19 / 50

19. What is or are the main disadvantage of the line organisation is?

20 / 50

20. Which type of organisation is very popular in Civil Engineering Constructions?

21 / 50

21. Line organisation is other wise known as?

22 / 50

22. What is the oldest method of project planning is?

23 / 50

23. Time and progress chart of a construction project is?

24 / 50

24. How is an dummy activity is represented?

25 / 50

25. If any activity delayed to their succeeding activity due to some reason, that delay is known as?

26 / 50

26. Finishing of any activity which falls in a CPM network is known as?

27 / 50

27. The task performed in CPM is known as?

28 / 50

28. A contractor in construction of a project is

29 / 50

29. What dose proper Co-ordination of construction means?

30 / 50

30. At which stage the specifications are prepared?

31 / 50

31. In PWD which type of organization is is widely used

32 / 50

32. Which of the following are the disadvantages of Line and Staff organization?

33 / 50

33. A project has three independent critical paths A, B and C. To reduce the project length, which one we have to shorten?

34 / 50

34. Consider the following statements regarding slack, choose the correct option; a) The free slack never exceeds the total slack b) The jobs that have total slack need not necessarily have the free slack c) A job can have a free slack only if it has more total slack that the one of its immediate successors.

35 / 50

35. Pick up the correct statement from the following with regards to P.M. network analysis of projects?

36 / 50

36. from the below given options choose which is an PERT event?

37 / 50

37. What is PERT?

38 / 50

38. What is CPM?

39 / 50

39. In a project logic, four activities M, N, 0 and P are to be completed before starting activity Q. If the finish times of M, N, 0 and P are 12-00 hr, 14-00 hr, 15-00 hr. and 17-00 hr. respectively, the earliest event occurrence time for the activity Q is?

40 / 50

40. Which one of the following represents an activity?

41 / 50

41. The critical activity has?

42 / 50

42. The performance of a specific task in CPM, is known as?

43 / 50

43. Bar charts are suitable for which types of works?

44 / 50

44. Choose from the following what does a milestone chart represent as?

45 / 50

45. Henry Gantt developed Bar charts for planning and scheduling of projects in which year?

46 / 50

46. Final technical authority of a project lies with whome?

47 / 50

47. What is the main principle of an organization?

48 / 50

48. Military organization is known as which type of organization?

49 / 50

49. While filling the tender for any work, the contractor considers which of the following?

50 / 50

50. Before the tender stage what is required?