FAQ’s for Quantity surveyor Jobs
1 / 50
1. What is the meaning of Cost?
2 / 50
2. The charges represented directly in the commodity produced are called as?
3 / 50
3. What do we call a person who takes the lease of any thing?
4 / 50
4. The Owner who allows another person to enjoy rights over his property is called as?
5 / 50
5. The long term lease is granter for how many years?
6 / 50
6. When we pay annuity at the end of each period for a certain number of years, what is it called as?
7 / 50
7. what do we call when we try to recive annuity for an indefinite period?
8 / 50
8. When we try to make the payment of a debt in a series of equal periodic instalments, it is called as?
9 / 50
9. What do we call when the capital sum required to be invested in order to receive an annuity at certain rate of interest, is called as?
10 / 50
10. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?
11 / 50
11. From the total cost of the construction how much % is the scrap value of the building?
12 / 50
12. If we sell a property lower than the market value of that time is said to have what value?
13 / 50
13. When we remove the original value from the depeciation value what do we get?
14 / 50
14. 1 bag of cement of 50 kgs covers how much volume?
15 / 50
15. Calculate the quantity of cement required for 10 m³ of brick work in cement mortar 1: 3?
16 / 50
16. How many bricks are required for 15 Cu.m of brick masonry work?
17 / 50
17. What do we call the process of determining the probable cost of the project after knowing the quantities of various items and their unit rate is called as?
18 / 50
18. What do we call the work done per day by a skilled labour to complete the quantity of work?
19 / 50
19. What is the abrivation of S.O.R as per Quantity Surveying?
20 / 50
20. For any work the rate of an item depends on which one of the following mentioned below?
21 / 50
21. Different weather conditions like extreme cold, heat or rain how will they effect the project?
22 / 50
22. What is the name given to the rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labors, the cost of equipments and other miscellaneous petty expenses require for the completion of the project?
23 / 50
23. Is the below statement True of False, Bricks shall be laid in English bond unless otherwise specified?
24 / 50
24. When ever we write the specifications it is written in a language so that they indicate what the work should be and words like “shall be” or “should be” are used. Is it Ture or False?
25 / 50
25. While we make specifications the sentence shall be in which format?
26 / 50
26. In all engineering departments they prepare detailed specifications of certain common items of construction and publish them in book form. What are such types of specifications called as?
27 / 50
27. Choose form the below mentioned options what is or are the Important contract documents?
28 / 50
28. From the below mentioned options which details are shown in the specifications?
29 / 50
29. What is the unit of measurment of Centering and shuttering?
30 / 50
30. The brick massonary for honey comb massonary is measured in?
31 / 50
31. What is the unit of measurment of Reinforced Cement Concrete(R.C.C)?
32 / 50
32. The birck work done in Foundation, Plinth level, Supestructure are measured in?
33 / 50
33. For hard soil the earthwork excavation is measured in?
34 / 50
34. In measuring plastering, no deduction is made for opening up to/ While we are doing the calcualtions for the palstering we don’t do the deductions for opening up to how many m²?
35 / 50
35. When we are measuring the weight of an item we corrrectly measure nearest to how much Kgs?
36 / 50
36. Choose from the below given options what do we consider while preparing a detailed estimate?
37 / 50
37. What do we call the cost for the items mentioned in the question: – general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job?
38 / 50
38. The amount which is provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing estimate is called as?
39 / 50
39. From the below mentioned options choose what is required while preparing a detailed estimate?
40 / 50
40. Which IS Code do we use for mode of measurment?
41 / 50
41. For some items it is hard for the for the estimator to fix an amount without seeing and studying them in detail. Such items are known as?
42 / 50
42. What is the abbreviation of CBRI?
43 / 50
43. While preparing the plint area estimate from the below mentioned options which item is not included?
44 / 50
44. What is the unit of dam used to measure for usage?
45 / 50
45. What is the unit of hospitals used for repesenting the usage of hospital?
46 / 50
46. To prepare an proper estimate of a work we requier Drawing, Specifications and what?
47 / 50
47. After knowing the quantittes of various items and their unit rate we calculate the Propable cost of the project what is it called as?
48 / 50
48. Which one of the following is the most reliable estimate?
49 / 50
49. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?
50 / 50
50. The correct metric unit is what is the corrcet metric units used for estimating th eqantities for construction of a building?