FAQ’s for Quantity surveyor Jobs

1 / 50

1. What is the meaning of Cost?

2 / 50

2. The charges represented directly in the commodity produced are called as?

3 / 50

3. The Owner who allows another person to enjoy rights over his property is called as?

4 / 50

4. When we pay annuity at the end of each period for a certain number of years, what is it called as?

5 / 50

5. what do we call when we try to recive annuity for an indefinite period?

6 / 50

6. The value of a property at the end of its usefull life with out dismanteling it is called as?

7 / 50

7. When we remove the original value from the depeciation value what do we get?

8 / 50

8. As per the standards what is the length of a steel rod in meters?

9 / 50

9. Calculate the quantity of aggregate required for 10 m³ of 1:2:4 cement concrete?

10 / 50

10. Calculate the quantity of cement required for 10 m³ of 1: 2 : 4 cement concrete?

11 / 50

11. 1 bag of cement of 50 kgs covers how much volume?

12 / 50

12. Calculate the quantity of sand required for 5 m³ of brick work in cement mortar 1: 6?

13 / 50

13. How many bricks are required for 15 Cu.m of brick masonry work?

14 / 50

14. What is the cost of a building which consist of 400 cubic meters. The rate per cubic meter is Rs. 180/- ?

15 / 50

15. What do we call the process of determining the probable cost of the project after knowing the quantities of various items and their unit rate is called as?

16 / 50

16. What is the process of calculating the quantities and costs of the various items required to complete the work is called as?

17 / 50

17. What si the standard size of a normal brick?

18 / 50

18. What is the abrivation of S.O.R as per Quantity Surveying?

19 / 50

19. Different weather conditions like extreme cold, heat or rain how will they effect the project?

20 / 50

20. What is the name given to the rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labors, the cost of equipments and other miscellaneous petty expenses require for the completion of the project?

21 / 50

21. Is the following statement True of False The steel used in the reinforcment shall be of mild steel or deformed steel?

22 / 50

22. As per which IS Code the sand should be used in the specifications?

23 / 50

23. What is the unit of measurment of excavation?

24 / 50

24. When ever we write the specifications it is written in a language so that they indicate what the work should be and words like “shall be” or “should be” are used. Is it Ture or False?

25 / 50

25. While we make specifications the sentence shall be in which format?

26 / 50

26. In the contract document which type of specificaitons is not a part of it?

27 / 50

27. Choose form the below mentioned options what is or are the Important contract documents?

28 / 50

28. From the below mentioned options which details are shown in the specifications?

29 / 50

29. The brick massonary for honey comb massonary is measured in?

30 / 50

30. Generally the Skirting is measured in?

31 / 50

31. The birck work done in Foundation, Plinth level, Supestructure are measured in?

32 / 50

32. The steel used in the reinforcments is mearuded in?

33 / 50

33. What is the Unit of measurment of Cement?

34 / 50

34. When we are measuring the weight of an item we corrrectly measure nearest to how much Kgs?

35 / 50

35. Choose from the below given options what do we consider while preparing a detailed estimate?

36 / 50

36. How much % of amount from detail estimate is their for work charged establishment?

37 / 50

37. While preparing the plint area estimate from the below mentioned options which item is not included?

38 / 50

38. What is the unit of dam used to measure for usage?

39 / 50

39. When we modifying the original detailed estimate and prepare a new estimate what is it called as?

40 / 50

40. From the below mentioned options choose which estimate is least accurate to work?

41 / 50

41. What is the process of calculating the quantities of various items for any construction work is is called as?

42 / 50

42. From the below mentioned options choose which is not included in the carpet area?

43 / 50

43. Pick up the correct statement from the below mentioned options?

44 / 50

44. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?

45 / 50

45. For which item the measurement is not made in square meters?

46 / 50

46. For the construction of buildings, What are the subheads of the estimate for construction of building?

47 / 50

47. The correct metric unit is what is the corrcet metric units used for estimating th eqantities for construction of a building?

48 / 50

48. The omitted cover of concrete is assumed to be for estimating a reinforced cement structure?

49 / 50

49. Which of these does not include the plinth area of a building?

50 / 50

50. To prepare a detailed estimate, what is the main factor to be considered?