/191

Practice – FAQ’s for Project Management Jobs

1 / 191

1. In which Report do we get the specific activities, events and occurrences?

2 / 191

2. Which one of the below mentioned options is an example of intellectual property?

3 / 191

3. Which one describe the ability to work successfully for a project to meet the futuristic goals?

4 / 191

4. Project Repot includes what from the below mentioned options?

5 / 191

5. What is the full form of PPP?

6 / 191

6. What is the full form of DPR?

7 / 191

7. In india which type of tax system is found?

8 / 191

8. Which tax is imposed by the Central Government but the state government collects the tax. What is that tax called as?

9 / 191

9. If any product is imported by any company from abroad, then which tax is applicable on it?

10 / 191

10. Which one is an indirect tax?

11 / 191

11. What is the abrevation of TCO?

12 / 191

12. A bussiness started by an enterpreneus with a fresh idea is performing which type of role in busines?

13 / 191

13. What are the duties of a junior engineer?

14 / 191

14. Rectifications of identified correcttions in cash-book are done using which colur pen?

15 / 191

15. Public Works Department executes projects primarly of which department?

16 / 191

16. For issue of the stock at store a price per unit is fixed. What is the price called as?

17 / 191

17. Tools and plants purchased for general use of division shall be debited to Which Catogery?

18 / 191

18. In which form number the measurement Book is maintained?

19 / 191

19. In which form number the first and final bill are maintained?

20 / 191

20. To the contractor we make the payment for work done but the quantity is not measured at the time of payment is called as?

21 / 191

21. In which form no the hand receipt are maintained?

22 / 191

22. All measurements of a work or project are entered in?

23 / 191

23. What is the meaning of intermediate payment?

24 / 191

24. The muster roll is maintained in which form no ?

25 / 191

25. Which of these works are included in Public Works Department?

26 / 191

26. To obtain work which sanction is not required?

27 / 191

27. For allotment of work quotations are invited in which type of system?

28 / 191

28. Choose which one are required in a Tender?

29 / 191

29. Which one is these is an psychological cause of accident?

30 / 191

30. For the success of any construction project what characteristics is/are required?

31 / 191

31. Which instrument is commonly used for sending an alerts message before starting of danger work?

32 / 191

32. From the security point of view what is the most suitable time of demolition?

33 / 191

33. For bitumen work what is/are the security measures?

34 / 191

34. The occurrence of accident in the construction will be effect?

35 / 191

35. to achieve good quality what do we require?

36 / 191

36. Brand value of any construction firm is created because of?

37 / 191

37. At which stage of construction, the inspection is required for error-free work to be executed?

38 / 191

38. What can we improve by the quality control method?

39 / 191

39. What are the cause of the accidents in the project site?

40 / 191

40. The major danger in the constructions are due to?

41 / 191

41. To get a quality work output we need to proper select what?

42 / 191

42. What can we stop using Inspection for the site?

43 / 191

43. The Triangle of construction management completes with?

44 / 191

44. From the given below options choose in which work, inspection plays a significant role ?

45 / 191

45. From the given below options choose the functions of the inspection department?

46 / 191

46. What do we call the charts used for the graphical representation of the operation analysis?

47 / 191

47. Select the type of measurement book used by the junior engineer from the given options?

48 / 191

48. The site engineer records the quantities of work done at the site and also uses it as a tool for payment to the contractor for his work done in a book. What is the book called as?

49 / 191

49. What is the process called in which the actual field or site progress is compared with the estimated progress?

50 / 191

50. For recording progress of any construction work is/ are what do we require?

51 / 191

51. The data or the information obtained through the various methods of progress record such as measurement book, job diary, progress report etc, are quantified and analyzed. Name what do we call this process as?

52 / 191

52. What are the following tools are required for the analysis of progress?

53 / 191

53. The analysis of progress of a project is done to achieve?

54 / 191

54. Which is the famous trade union of India ?

55 / 191

55. The minimum number of labour required for the applicability of Contract Labour Act?

56 / 191

56. According to minimum wages act normal working hours for adult workers is?

57 / 191

57. A site engineer should ensure to have best output of the work given to the labour must be?

58 / 191

58. By whome the Job layout is prepared?

59 / 191

59. The systematic placement of resources in site are termed as?

60 / 191

60. The materials stored at the site should be protected from?

61 / 191

61. Why do we use Job layout facilitate in construction work to proceed?

62 / 191

62. What is the aim of organising labour at the site?

63 / 191

63. Name the unit provided for fire hazards safety purposes?

64 / 191

64. The major principle of storing and stacking of any materials is to achieve with?

65 / 191

65. Which type of organisational structure is mostly followed in civil construction?

66 / 191

66. What are the factors on which the job layout for any project will depend?

67 / 191

67. The plan which shows the exact location for placing the resources for construction is known as?

68 / 191

68. What are the main advantage of line organisation?

69 / 191

69. What is the first stage of a construction?

70 / 191

70. Who are involved in selection of a construction site?

71 / 191

71. What is or are the main disadvantage of the line organisation is?

72 / 191

72. What is or are the main principle of an organisation?

73 / 191

73. Which type of organisation is very popular in Civil Engineering Constructions?

74 / 191

74. Line organisation is other wise known as?

75 / 191

75. Which of the following does not represent an activity?

76 / 191

76. What are the elements of construction project planning?

77 / 191

77. From the below given options choose time estimates of activities and probability of their occurrence followed by PERT analysis is called as?

78 / 191

78. What is Slack time?

79 / 191

79. Which of the following is an event ?

80 / 191

80. An event is represented in the network through which symbol?

81 / 191

81. Contractor focuses on which one of the follwing during the tender filling process?

82 / 191

82. Which one of the following is used in PERT method ?

83 / 191

83. What does the critical activity shows?

84 / 191

84. What is the oldest method of project planning is?

85 / 191

85. Time and progress chart of a construction project is?

86 / 191

86. How is an dummy activity is represented?

87 / 191

87. If any activity delayed to their succeeding activity due to some reason, that delay is known as?

88 / 191

88. Finishing of any activity which falls in a CPM network is known as?

89 / 191

89. The task performed in CPM is known as?

90 / 191

90. Which one of the following is an activity?

91 / 191

91. Which one of the following is not a resource of construction industry?

92 / 191

92. In construction project owner may be functional as?

93 / 191

93. What is the main factor which affects the construction of project most?

94 / 191

94. Which of these is the first largest industry in India in term of economic activity?

95 / 191

95. As per the term economic activity the second largest industry in India is?

96 / 191

96. Railway projects construction comes in which type of construction?

97 / 191

97. A contractor in construction of a project is

98 / 191

98. Construction of the power station comes in which type of construction as per the options mentioned below

99 / 191

99. What dose proper Co-ordination of construction means?

100 / 191

100. What does the Construction team means?

101 / 191

101. As pet the below mentioned optioned each work should be planned with respect to?

102 / 191

102. What is the main function of the construction management?

103 / 191

103. What are the qualities of good construction manager?

104 / 191

104. At which stage the tests for performance of construction is done

105 / 191

105. At which stage the contract documents are prepared?

106 / 191

106. Supervision for quality control is the part of which stage

107 / 191

107. At which stage the specifications are prepared?

108 / 191

108. From the below mentioned optiones which of the following is not role of the contractor

109 / 191

109. From the below mentioned optiones which of the following is not arole of the owner

110 / 191

110. In PWD which type of organization is is widely used

111 / 191

111. Which of the following are the disadvantages of Line and Staff organization?

112 / 191

112. Which of the following is not a characteristics of a Good organization ?

113 / 191

113. Road is included in which type of constructions mentioned below

114 / 191

114. What is an organization?

115 / 191

115. What arethe 4M of construction?

116 / 191

116. A project has three independent critical paths A, B and C. To reduce the project length, which one we have to shorten?

117 / 191

117. Pick up the correct statement regarding CPM from the below mentioned options?

118 / 191

118. Consider the following statements regarding slack, choose the correct option; a) The free slack never exceeds the total slack b) The jobs that have total slack need not necessarily have the free slack c) A job can have a free slack only if it has more total slack that the one of its immediate successors.

119 / 191

119. Pick up the correct statement regarding PERT from the below mwntioned options?

120 / 191

120. Consider the following definitions regarding slacks of project activities, from the below mentions options a) The difference between the early start and late start times of a job is called the total slack. b) The critical path is the one whose jobs have zero total slack c) The amount of time by which a job can be delayed without affecting the early start time of any job is called as the free slack d) The difference between the total slack of an activity and the minimum total slack of all its immediate successors is called as free slack.

121 / 191

121. Consider the following statements regarding Early start and early finish times, Choose the corrcet option. a) The earliest possible that the job can begin, is called the early start of the job b) The early finish of a job is early start time plus the job’s completion time c) For jobs with no predecessors, the early start is equal to start time of the project d) The early start of a job is the largest of the early finish times of all of the immediately predecessors.

122 / 191

122. In CPM analysis what do we choose?

123 / 191

123. Pick up the correct statement from the following with regards to P.M. network analysis of projects?

124 / 191

124. Consider the following statements regarding the critical path of a project network. choose the correct option a) path is a set of nodes connected by arrows which begin at its initial node of the network and end at the terminal. b) The length of a path in a network is the total time it takes to travel the path. c) The shortest path in a project network is called critical path, d)Activities on the critical path are called critical activities.

125 / 191

125. from the below given options choose which is an PERT event?

126 / 191

126. Choose from the below what is frequency distribution curves?

127 / 191

127. Pick up the incorrect statement from the below mentioned options?

128 / 191

128. If A is the optimistic time, B is the pessimistic time and M is most likely time of an activity, the expected time of the activity, is?

129 / 191

129. What is PERT?

130 / 191

130. What is CPM?

131 / 191

131. A CPM family includes which of the following?

132 / 191

132. The time which results in the least possible construction cost of an activity, is known as?

133 / 191

133. What is a critical ratio scheduling?

134 / 191

134. The technique for establishing and maintaining priorities among the various jobs of a project, is known as?

135 / 191

135. Critical path lies along the activities having total float?

136 / 191

136. Critical Path network helps an engineer to understand?

137 / 191

137. Pick up the correct statement from the following?

138 / 191

138. In a project logic, four activities M, N, 0 and P are to be completed before starting activity Q. If the finish times of M, N, 0 and P are 12-00 hr, 14-00 hr, 15-00 hr. and 17-00 hr. respectively, the earliest event occurrence time for the activity Q is?

139 / 191

139. In a certain project an activity C can only be started when activities A and B have been completed, which have no bearing on each other and can be started independently. The correct network for the activities, is?

140 / 191

140. Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following?

141 / 191

141. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be?

142 / 191

142. Which one of the following represents an event?

143 / 191

143. The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as?

144 / 191

144. For completion of a project, the critical path of the network represents?

145 / 191

145. Which one of the following represents an activity?

146 / 191

146. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to?

147 / 191

147. The critical activity has?

148 / 191

148. The estimated time required to perform an activity, is known as?

149 / 191

149. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then which of the following relation holds good?

150 / 191

150. The difference between the time available to do a job and the time required to do the job, is known as?

151 / 191

151. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as?

152 / 191

152. What is a dummy activity?

153 / 191

153. An event is indicated on the network by a number enclosed in which symbol?

154 / 191

154. The performance of a specific task in CPM, is known as?

155 / 191

155. Completion of an activity on CPM network diagram, is generally known as?

156 / 191

156. While scheduling a project by P.M what does he consider?

157 / 191

157. Critical path method is?

158 / 191

158. PERT analysis is based on?

159 / 191

159. Bar charts are suitable for which types of works?

160 / 191

160. What was the first method invented for planning projects?

161 / 191

161. Choose from the following what does a milestone chart represent as?

162 / 191

162. Mile Stone charts were invented in which year?

163 / 191

163. For the supply of materials for concrete, farm work reinforcing and placing of concrete, removal of farm work and curing of concrete, number of bar(s) required on bar chart, is?

164 / 191

164. Various activities of a project, are shown on bar charts in which format?

165 / 191

165. Site order book is used for recording what?

166 / 191

166. The Overall in-charge of an organization at the site responsible for the execution of the works, is called as?

167 / 191

167. Henry Gantt developed Bar charts for planning and scheduling of projects in which year?

168 / 191

168. An Executive Engineer may have powers to approve amount up to?

169 / 191

169. Final technical authority of a project lies with whome?

170 / 191

170. What is the main principle of an organization?

171 / 191

171. What is the main feature of functional organization?

172 / 191

172. What is the most popular type of organization used for Civil Engineering Constructions?

173 / 191

173. Frederick W. Taylor introduced a system of working which is known as?

174 / 191

174. A construction schedule is prepared after collecting which of the following data?

175 / 191

175. The main disadvantage of line organization is?

176 / 191

176. What is the main advantage of line organization?

177 / 191

177. Military organization is known as which type of organization?

178 / 191

178. While filling the tender for any work, the contractor considers which of the following?

179 / 191

179. Time and progress chart of a construction, is also known as?

180 / 191

180. Modular co-ordination of construction means proper?

181 / 191

181. What is the object of technical planning?

182 / 191

182. For the execution of a project, the role of a contractor is?

183 / 191

183. What is the golden rule for the procurement of materials in construction?

184 / 191

184. Construction team includes the following resources?

185 / 191

185. Before the tender stage what is required?

186 / 191

186. The final selection of a construction site, is done by?

187 / 191

187. Power stations are generally treated as which type of construtions?

188 / 191

188. Railway projects are treated as which type of construtions?

189 / 191

189. Residential buildings are treated as which type of construtions?

190 / 191

190. Works costing less than Rs 20,000 are treated as?

191 / 191

191. What should be the minimum cost of a work to be called as project?

Your score is