Practice – FAQ’s for Project Management Jobs
1 / 191
1. In which Report do we get the specific activities, events and occurrences?
2 / 191
2. Which one of the below mentioned options is an example of intellectual property?
3 / 191
3. Which one describe the ability to work successfully for a project to meet the futuristic goals?
4 / 191
4. Project Repot includes what from the below mentioned options?
5 / 191
5. What is the full form of PPP?
6 / 191
6. What is the full form of DPR?
7 / 191
7. In india which type of tax system is found?
8 / 191
8. Which tax is imposed by the Central Government but the state government collects the tax. What is that tax called as?
9 / 191
9. If any product is imported by any company from abroad, then which tax is applicable on it?
10 / 191
10. Which one is an indirect tax?
11 / 191
11. What is the abrevation of TCO?
12 / 191
12. A bussiness started by an enterpreneus with a fresh idea is performing which type of role in busines?
13 / 191
13. What are the duties of a junior engineer?
14 / 191
14. Rectifications of identified correcttions in cash-book are done using which colur pen?
15 / 191
15. Public Works Department executes projects primarly of which department?
16 / 191
16. For issue of the stock at store a price per unit is fixed. What is the price called as?
17 / 191
17. Tools and plants purchased for general use of division shall be debited to Which Catogery?
18 / 191
18. In which form number the measurement Book is maintained?
19 / 191
19. In which form number the first and final bill are maintained?
20 / 191
20. To the contractor we make the payment for work done but the quantity is not measured at the time of payment is called as?
21 / 191
21. In which form no the hand receipt are maintained?
22 / 191
22. All measurements of a work or project are entered in?
23 / 191
23. What is the meaning of intermediate payment?
24 / 191
24. The muster roll is maintained in which form no ?
25 / 191
25. Which of these works are included in Public Works Department?
26 / 191
26. To obtain work which sanction is not required?
27 / 191
27. For allotment of work quotations are invited in which type of system?
28 / 191
28. Choose which one are required in a Tender?
29 / 191
29. Which one is these is an psychological cause of accident?
30 / 191
30. For the success of any construction project what characteristics is/are required?
31 / 191
31. Which instrument is commonly used for sending an alerts message before starting of danger work?
32 / 191
32. From the security point of view what is the most suitable time of demolition?
33 / 191
33. For bitumen work what is/are the security measures?
34 / 191
34. The occurrence of accident in the construction will be effect?
35 / 191
35. to achieve good quality what do we require?
36 / 191
36. Brand value of any construction firm is created because of?
37 / 191
37. At which stage of construction, the inspection is required for error-free work to be executed?
38 / 191
38. What can we improve by the quality control method?
39 / 191
39. What are the cause of the accidents in the project site?
40 / 191
40. The major danger in the constructions are due to?
41 / 191
41. To get a quality work output we need to proper select what?
42 / 191
42. What can we stop using Inspection for the site?
43 / 191
43. The Triangle of construction management completes with?
44 / 191
44. From the given below options choose in which work, inspection plays a significant role ?
45 / 191
45. From the given below options choose the functions of the inspection department?
46 / 191
46. What do we call the charts used for the graphical representation of the operation analysis?
47 / 191
47. Select the type of measurement book used by the junior engineer from the given options?
48 / 191
48. The site engineer records the quantities of work done at the site and also uses it as a tool for payment to the contractor for his work done in a book. What is the book called as?
49 / 191
49. What is the process called in which the actual field or site progress is compared with the estimated progress?
50 / 191
50. For recording progress of any construction work is/ are what do we require?
51 / 191
51. The data or the information obtained through the various methods of progress record such as measurement book, job diary, progress report etc, are quantified and analyzed. Name what do we call this process as?
52 / 191
52. What are the following tools are required for the analysis of progress?
53 / 191
53. The analysis of progress of a project is done to achieve?
54 / 191
54. Which is the famous trade union of India ?
55 / 191
55. The minimum number of labour required for the applicability of Contract Labour Act?
56 / 191
56. According to minimum wages act normal working hours for adult workers is?
57 / 191
57. A site engineer should ensure to have best output of the work given to the labour must be?
58 / 191
58. By whome the Job layout is prepared?
59 / 191
59. The systematic placement of resources in site are termed as?
60 / 191
60. The materials stored at the site should be protected from?
61 / 191
61. Why do we use Job layout facilitate in construction work to proceed?
62 / 191
62. What is the aim of organising labour at the site?
63 / 191
63. Name the unit provided for fire hazards safety purposes?
64 / 191
64. The major principle of storing and stacking of any materials is to achieve with?
65 / 191
65. Which type of organisational structure is mostly followed in civil construction?
66 / 191
66. What are the factors on which the job layout for any project will depend?
67 / 191
67. The plan which shows the exact location for placing the resources for construction is known as?
68 / 191
68. What are the main advantage of line organisation?
69 / 191
69. What is the first stage of a construction?
70 / 191
70. Who are involved in selection of a construction site?
71 / 191
71. What is or are the main disadvantage of the line organisation is?
72 / 191
72. What is or are the main principle of an organisation?
73 / 191
73. Which type of organisation is very popular in Civil Engineering Constructions?
74 / 191
74. Line organisation is other wise known as?
75 / 191
75. Which of the following does not represent an activity?
76 / 191
76. What are the elements of construction project planning?
77 / 191
77. From the below given options choose time estimates of activities and probability of their occurrence followed by PERT analysis is called as?
78 / 191
78. What is Slack time?
79 / 191
79. Which of the following is an event ?
80 / 191
80. An event is represented in the network through which symbol?
81 / 191
81. Contractor focuses on which one of the follwing during the tender filling process?
82 / 191
82. Which one of the following is used in PERT method ?
83 / 191
83. What does the critical activity shows?
84 / 191
84. What is the oldest method of project planning is?
85 / 191
85. Time and progress chart of a construction project is?
86 / 191
86. How is an dummy activity is represented?
87 / 191
87. If any activity delayed to their succeeding activity due to some reason, that delay is known as?
88 / 191
88. Finishing of any activity which falls in a CPM network is known as?
89 / 191
89. The task performed in CPM is known as?
90 / 191
90. Which one of the following is an activity?
91 / 191
91. Which one of the following is not a resource of construction industry?
92 / 191
92. In construction project owner may be functional as?
93 / 191
93. What is the main factor which affects the construction of project most?
94 / 191
94. Which of these is the first largest industry in India in term of economic activity?
95 / 191
95. As per the term economic activity the second largest industry in India is?
96 / 191
96. Railway projects construction comes in which type of construction?
97 / 191
97. A contractor in construction of a project is
98 / 191
98. Construction of the power station comes in which type of construction as per the options mentioned below
99 / 191
99. What dose proper Co-ordination of construction means?
100 / 191
100. What does the Construction team means?
101 / 191
101. As pet the below mentioned optioned each work should be planned with respect to?
102 / 191
102. What is the main function of the construction management?
103 / 191
103. What are the qualities of good construction manager?
104 / 191
104. At which stage the tests for performance of construction is done
105 / 191
105. At which stage the contract documents are prepared?
106 / 191
106. Supervision for quality control is the part of which stage
107 / 191
107. At which stage the specifications are prepared?
108 / 191
108. From the below mentioned optiones which of the following is not role of the contractor
109 / 191
109. From the below mentioned optiones which of the following is not arole of the owner
110 / 191
110. In PWD which type of organization is is widely used
111 / 191
111. Which of the following are the disadvantages of Line and Staff organization?
112 / 191
112. Which of the following is not a characteristics of a Good organization ?
113 / 191
113. Road is included in which type of constructions mentioned below
114 / 191
114. What is an organization?
115 / 191
115. What arethe 4M of construction?
116 / 191
116. A project has three independent critical paths A, B and C. To reduce the project length, which one we have to shorten?
117 / 191
117. Pick up the correct statement regarding CPM from the below mentioned options?
118 / 191
118. Consider the following statements regarding slack, choose the correct option; a) The free slack never exceeds the total slack b) The jobs that have total slack need not necessarily have the free slack c) A job can have a free slack only if it has more total slack that the one of its immediate successors.
119 / 191
119. Pick up the correct statement regarding PERT from the below mwntioned options?
120 / 191
120. Consider the following definitions regarding slacks of project activities, from the below mentions options a) The difference between the early start and late start times of a job is called the total slack. b) The critical path is the one whose jobs have zero total slack c) The amount of time by which a job can be delayed without affecting the early start time of any job is called as the free slack d) The difference between the total slack of an activity and the minimum total slack of all its immediate successors is called as free slack.
121 / 191
121. Consider the following statements regarding Early start and early finish times, Choose the corrcet option. a) The earliest possible that the job can begin, is called the early start of the job b) The early finish of a job is early start time plus the job’s completion time c) For jobs with no predecessors, the early start is equal to start time of the project d) The early start of a job is the largest of the early finish times of all of the immediately predecessors.
122 / 191
122. In CPM analysis what do we choose?
123 / 191
123. Pick up the correct statement from the following with regards to P.M. network analysis of projects?
124 / 191
124. Consider the following statements regarding the critical path of a project network. choose the correct option a) path is a set of nodes connected by arrows which begin at its initial node of the network and end at the terminal. b) The length of a path in a network is the total time it takes to travel the path. c) The shortest path in a project network is called critical path, d)Activities on the critical path are called critical activities.
125 / 191
125. from the below given options choose which is an PERT event?
126 / 191
126. Choose from the below what is frequency distribution curves?
127 / 191
127. Pick up the incorrect statement from the below mentioned options?
128 / 191
128. If A is the optimistic time, B is the pessimistic time and M is most likely time of an activity, the expected time of the activity, is?
129 / 191
129. What is PERT?
130 / 191
130. What is CPM?
131 / 191
131. A CPM family includes which of the following?
132 / 191
132. The time which results in the least possible construction cost of an activity, is known as?
133 / 191
133. What is a critical ratio scheduling?
134 / 191
134. The technique for establishing and maintaining priorities among the various jobs of a project, is known as?
135 / 191
135. Critical path lies along the activities having total float?
136 / 191
136. Critical Path network helps an engineer to understand?
137 / 191
137. Pick up the correct statement from the following?
138 / 191
138. In a project logic, four activities M, N, 0 and P are to be completed before starting activity Q. If the finish times of M, N, 0 and P are 12-00 hr, 14-00 hr, 15-00 hr. and 17-00 hr. respectively, the earliest event occurrence time for the activity Q is?
139 / 191
139. In a certain project an activity C can only be started when activities A and B have been completed, which have no bearing on each other and can be started independently. The correct network for the activities, is?
140 / 191
140. Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following?
141 / 191
141. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be?
142 / 191
142. Which one of the following represents an event?
143 / 191
143. The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as?
144 / 191
144. For completion of a project, the critical path of the network represents?
145 / 191
145. Which one of the following represents an activity?
146 / 191
146. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to?
147 / 191
147. The critical activity has?
148 / 191
148. The estimated time required to perform an activity, is known as?
149 / 191
149. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then which of the following relation holds good?
150 / 191
150. The difference between the time available to do a job and the time required to do the job, is known as?
151 / 191
151. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as?
152 / 191
152. What is a dummy activity?
153 / 191
153. An event is indicated on the network by a number enclosed in which symbol?
154 / 191
154. The performance of a specific task in CPM, is known as?
155 / 191
155. Completion of an activity on CPM network diagram, is generally known as?
156 / 191
156. While scheduling a project by P.M what does he consider?
157 / 191
157. Critical path method is?
158 / 191
158. PERT analysis is based on?
159 / 191
159. Bar charts are suitable for which types of works?
160 / 191
160. What was the first method invented for planning projects?
161 / 191
161. Choose from the following what does a milestone chart represent as?
162 / 191
162. Mile Stone charts were invented in which year?
163 / 191
163. For the supply of materials for concrete, farm work reinforcing and placing of concrete, removal of farm work and curing of concrete, number of bar(s) required on bar chart, is?
164 / 191
164. Various activities of a project, are shown on bar charts in which format?
165 / 191
165. Site order book is used for recording what?
166 / 191
166. The Overall in-charge of an organization at the site responsible for the execution of the works, is called as?
167 / 191
167. Henry Gantt developed Bar charts for planning and scheduling of projects in which year?
168 / 191
168. An Executive Engineer may have powers to approve amount up to?
169 / 191
169. Final technical authority of a project lies with whome?
170 / 191
170. What is the main principle of an organization?
171 / 191
171. What is the main feature of functional organization?
172 / 191
172. What is the most popular type of organization used for Civil Engineering Constructions?
173 / 191
173. Frederick W. Taylor introduced a system of working which is known as?
174 / 191
174. A construction schedule is prepared after collecting which of the following data?
175 / 191
175. The main disadvantage of line organization is?
176 / 191
176. What is the main advantage of line organization?
177 / 191
177. Military organization is known as which type of organization?
178 / 191
178. While filling the tender for any work, the contractor considers which of the following?
179 / 191
179. Time and progress chart of a construction, is also known as?
180 / 191
180. Modular co-ordination of construction means proper?
181 / 191
181. What is the object of technical planning?
182 / 191
182. For the execution of a project, the role of a contractor is?
183 / 191
183. What is the golden rule for the procurement of materials in construction?
184 / 191
184. Construction team includes the following resources?
185 / 191
185. Before the tender stage what is required?
186 / 191
186. The final selection of a construction site, is done by?
187 / 191
187. Power stations are generally treated as which type of construtions?
188 / 191
188. Railway projects are treated as which type of construtions?
189 / 191
189. Residential buildings are treated as which type of construtions?
190 / 191
190. Works costing less than Rs 20,000 are treated as?
191 / 191
191. What should be the minimum cost of a work to be called as project?