Practice- FAQ’s for Quantity surveyor Jobs
1 / 120
1. What is the meaning of Cost?
2 / 120
2. The charges represented directly in the commodity produced are called as?
3 / 120
3. What is the meaning of Price?
4 / 120
4. What do we call a person who takes the lease of any thing?
5 / 120
5. What is the meaning of net income?
6 / 120
6. When we deduct outging amount from the gross income what do we call it as?
7 / 120
7. When we get total income from different sources what do we call it as?
8 / 120
8. The Owner who allows another person to enjoy rights over his property is called as?
9 / 120
9. The perpetuity lease(Endless Duration) is granted for how many years?
10 / 120
10. The long term lease is granter for how many years?
11 / 120
11. What do we calll the owner who grants the lease of the property to the other person as?
12 / 120
12. When we pay annuity at the end of each period for a certain number of years, what is it called as?
13 / 120
13. what do we call when we try to recive annuity for an indefinite period?
14 / 120
14. When we try to make the payment of a debt in a series of equal periodic instalments, it is called as?
15 / 120
15. What do we call when the capital sum required to be invested in order to receive an annuity at certain rate of interest, is called as?
16 / 120
16. The net instalment of annual or periodical payment for repayment of capital amount invested in a property for a specified period is called as?
17 / 120
17. If a property is capable of fetching more return due to its alternative use or by providing some development works, such inherent value of a property is known as?
18 / 120
18. From the total cost of the construction how much % is the scrap value of the building?
19 / 120
19. If we sell a property lower than the market value of that time is said to have what value?
20 / 120
20. The value of a property at the end of its usefull life with out dismanteling it is called as?
21 / 120
21. When we remove the original value from the depeciation value what do we get?
22 / 120
22. When we dismantel the property when we can not use the property for usage we try to sell that waste materila, what do we call that value as?
23 / 120
23. When we put the property for sale in open market at any particuar time the price what we obtain is called as?
24 / 120
24. As per the standards what is the length of a steel rod in meters?
25 / 120
25. Calcualte the quantity of sand required for 10 m³ of 1:2:4 cement concrete?
26 / 120
26. Calculate the quantity of aggregate required for 10 m³ of 1:2:4 cement concrete?
27 / 120
27. Calculate the quantity of cement required for 10 m³ of 1: 2 : 4 cement concrete?
28 / 120
28. 1 bag of cement of 50 kgs covers how much volume?
29 / 120
29. Calculate the quantity of sand required for 5 m³ of brick work in cement mortar 1: 6?
30 / 120
30. Calculate the quantity of cement required for 10 m³ of brick work in cement mortar 1: 3?
31 / 120
31. How many bricks are required for 15 Cu.m of brick masonry work?
32 / 120
32. Which IS Code do we use for mode of measurment?
33 / 120
33. What is the cost of a building which consist of 400 cubic meters. The rate per cubic meter is Rs. 180/- ?
34 / 120
34. What do we call the process of determining the probable cost of the project after knowing the quantities of various items and their unit rate is called as?
35 / 120
35. What do we call the process of calculating the quantities of various items required for complete the project?
36 / 120
36. What is the process of calculating the quantities and costs of the various items required to complete the work is called as?
37 / 120
37. What si the standard size of a normal brick?
38 / 120
38. What do we call the work done per day by a skilled labour to complete the quantity of work?
39 / 120
39. For the list of rates of various items is prepared after the analysis of rates and document is prepared. What is that document called as?
40 / 120
40. What is the abrivation of S.O.R as per Quantity Surveying?
41 / 120
41. For any work the rate of an item depends on which one of the following mentioned below?
42 / 120
42. Different weather conditions like extreme cold, heat or rain how will they effect the project?
43 / 120
43. What is the name given to the rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labors, the cost of equipments and other miscellaneous petty expenses require for the completion of the project?
44 / 120
44. Is the below statement True of False, Bricks shall be laid in English bond unless otherwise specified?
45 / 120
45. If a 1st class dry brick is immersed in water for 24 hours how % of water should it absorb by its weight?
46 / 120
46. Is the following statement True of False The steel used in the reinforcment shall be of mild steel or deformed steel?
47 / 120
47. As per IS: 269, what should be the minimum compressive strength of Ordinary Portland Cement?
48 / 120
48. As per which IS Code the sand should be used in the specifications?
49 / 120
49. As per which IS Code the cement should be used in the specifications?
50 / 120
50. What is the unit of measurment of excavation?
51 / 120
51. When ever we write the specifications it is written in a language so that they indicate what the work should be and words like “shall be” or “should be” are used. Is it Ture or False?
52 / 120
52. While we make specifications the sentence shall be in which format?
53 / 120
53. The Public Works department publishes the standard specifications in a book. What is the name given to that book?
54 / 120
54. In all engineering departments they prepare detailed specifications of certain common items of construction and publish them in book form. What are such types of specifications called as?
55 / 120
55. In the contract document which type of specificaitons is a part of it?
56 / 120
56. In the contract document which type of specificaitons is not a part of it?
57 / 120
57. Specifications are divided in to two catogories the first one is general specifications or brief specificatons and what is the second one called as?
58 / 120
58. Choose form the below mentioned options what is or are the Important contract documents?
59 / 120
59. From the below mentioned options which details are shown in the specifications?
60 / 120
60. What is the term given for the detailed description of the quality of materials and workmanship required to complete an engineering project in accordance with its drawings and details?
61 / 120
61. What is the unit of measurment of Centering and shuttering?
62 / 120
62. The unit of measurement of steel railing is?
63 / 120
63. The brick massonary for honey comb massonary is measured in?
64 / 120
64. Generally the Skirting is measured in?
65 / 120
65. What is the unit of measurment of Reinforced Cement Concrete(R.C.C)?
66 / 120
66. What is the unit of measurment of damp proof course (D.P.C.)?
67 / 120
67. The birck work done in Foundation, Plinth level, Supestructure are measured in?
68 / 120
68. what is the unit of measurment of Surface dressing?
69 / 120
69. For hard soil the earthwork excavation is measured in?
70 / 120
70. The steel used in the reinforcments is mearuded in?
71 / 120
71. When we measure the wood, what units do use to measure them?
72 / 120
72. What is the Unit of measurment of Cement?
73 / 120
73. In measuring plastering, no deduction is made for opening up to/ While we are doing the calcualtions for the palstering we don’t do the deductions for opening up to how many m²?
74 / 120
74. While doing backfilling or refilling earthwork in foundation pit the thickness should not exceed for each layer?
75 / 120
75. The bricks for masonry structure are measured in cubic meters except in the case of?
76 / 120
76. When we are measuring the weight of an item we corrrectly measure nearest to how much Kgs?
77 / 120
77. Choose from the below given options what do we consider while preparing a detailed estimate?
78 / 120
78. What do we call the cost for the items mentioned in the question: – general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job?
79 / 120
79. From the below mentioned options select which one is not a spot item?
80 / 120
80. The amount which is provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing estimate is called as?
81 / 120
81. When we are measuring an area we measure it correctly and nearest to?
82 / 120
82. What is the order or sequence of measurment as per ISI method which is to be used?
83 / 120
83. From the below mentioned options choose what is required while preparing a detailed estimate?
84 / 120
84. Which IS Code do we use for mode of measurment?
85 / 120
85. How much % of amount from detail estimate is their for work charged establishment?
86 / 120
86. The provision of an incidental expense variation in detailed estimate is how much % ?
87 / 120
87. For some items it is hard for the for the estimator to fix an amount without seeing and studying them in detail. Such items are known as?
88 / 120
88. What is the term give to the procedure of costing or valuing an item of work on the basis of actual laborers and materials required?
89 / 120
89. What is the abbreviation of CBRI?
90 / 120
90. The Electrification cost of a building is how much % of total estimate?
91 / 120
91. The area of our house in which we can live is called as?
92 / 120
92. What is the meaning of Floor area?
93 / 120
93. While preparing the plint area estimate from the below mentioned options which item is not included?
94 / 120
94. Based on the plinth area of the building which estimate is prepared?
95 / 120
95. What is the unit of road used for the measurment for usage?
96 / 120
96. What is the unit of stadium used for the usage?
97 / 120
97. What is the unit of dam used to measure for usage?
98 / 120
98. What is the unit of hospitals used for repesenting the usage of hospital?
99 / 120
99. When we modifying the original detailed estimate and prepare a new estimate what is it called as?
100 / 120
100. We use appoximate estimate to prepare an estimate for an work what is also known as?
101 / 120
101. From the below mentioned options choose which estimate is least accurate to work?
102 / 120
102. To prepare an proper estimate of a work we requier Drawing, Specifications and what?
103 / 120
103. After knowing the quantittes of various items and their unit rate we calculate the Propable cost of the project what is it called as?
104 / 120
104. What is the process of calculating the quantities of various items for any construction work is is called as?
105 / 120
105. The calculation of the quantities and costs of the various items required for work is called as?
106 / 120
106. How much % of balcony area is included in the floor area?
107 / 120
107. From the below mentioned options choose which is not included in the carpet area?
108 / 120
108. Pick up the correct statement from the below mentioned options?
109 / 120
109. Which one of the following is the most reliable estimate?
110 / 120
110. If there are changes in the price we prepare a revise estimate is the sanction estimate exceeds how much % ?
111 / 120
111. For which item the measurement is not made in square meters?
112 / 120
112. For the construction of buildings, What are the subheads of the estimate for construction of building?
113 / 120
113. What is the actual size of a modular brick according to Indian Standard institute?
114 / 120
114. The correct metric unit is what is the corrcet metric units used for estimating th eqantities for construction of a building?
115 / 120
115. The omitted cover of concrete is assumed to be for estimating a reinforced cement structure?
116 / 120
116. Which of these does not include the plinth area of a building?
117 / 120
117. To prepare a detailed estimate, what is the main factor to be considered?
118 / 120
118. To do a work the rate of an item depends on?
119 / 120
119. How much water is required for one kg distemper?
120 / 120
120. For one Cubic Meter of brick masonary how many bricks are required?
Your score is
Restart quiz